Burrtec Waste Industries
San Bernardino, CA
HKA was contracted by Burrtec Waste Industries to provide modification plans of a traffic signal at the intersection of Mill Street and South Sierra Way in San Bernardino. The city required upgrades to the signal operation as well.
Services performed by HKA included:
- Replacing the existing signal heads with heavier weight heads
- Changes in the number of lanes or currently assigned turning moments
- Phase changes to the phasing operation of the signal
- Video Detection
- A truck turning movement analysis
- Relocation of any signal standards other than the signal in the northeast corner
- Right-of-way analysis
- Extensive utility research